|
---|
Showing posts with label Procedure. Show all posts
Showing posts with label Procedure. Show all posts
Tuesday, April 12, 2011
Hot Bolting Procedure
METHODOLOGYWhen contemplating hot bolting a number of factors need to be considered. These include, but are not limited to: · Working procedures and guidelines· The piping system and the system's operating pressures and temperatures· Flange joints considered for hot bolting should have a minimum of 8 (eight) bolts. The bolt material should have a minimum strength equal to
Subscribe to:
Posts (Atom)